| 24th Street @ Camelback |
Phoenix, Arizona |
Holder Construction |
 |
|
Completion Date: 2010
24th Street @ Camelback in Phoenix, Arizona, is a new eleven-story, 300,000 square foot Class A office building at the heart of a 10-acre master-planned, mixed-use complex. Buesing Corp. was hired to excavate and shore the two-level below-gr... |
|
| 3900 Camelback Center |
Phoenix, Arizona |
Ryan Companies US, Inc. |
 |
|
Completion Date: 2009
3900 Camelback is a three-story office development in the Camelback corridor in Phoenix, Arizona. Buesing Corp. was contracted to perform excavation, shoring, and shotcrete finish walls. The two-story underground garage presented many obstacles including th... |
|
| Bumstead Facility Brine Ponds Retaining Walls |
Waddell, Arizona |
Plains LPG Services, LP |
 |
|
Completion Date: 2011
Located at the Bumstead Facility in Waddell, Arizona, the project consists of the construction of a new retaining wall and the north and south retention basins. Buesing Corp.’s scope of work included the construction of the concrete and masonry block retaining wall... |
|
| Casino Arizona Resort & Spa – Indian Bend Road |
Scottsdale, Arizona |
Chanen Construction Company, Inc. |
 |
|
Completion Date: 2010
The new expansion to Casino Arizona at Indian Bend Road in Scottsdale, Arizona, will include more than 100,000 square feet of indoor and outdoor conference space, a 24,000 square foot ballroom, and 21 meeting rooms. Buesing Corp. was contracted for multiple... |
|
| City of Tucson 1MW Solar Project |
Tucson, Arizona |
SunPower Corporation, Systems |
 |
|
Completion Date: 2011
The 1.0MW photovoltaic solar array project is tied to the Central Avra Valley Recharge facility located northwest of Tucson, Arizona, and has a potential of expansion to ultimately 5MW of capacity. Located on ten acres of former agricultural lan... |
|
| CityScape Downtown Phoenix |
Phoenix, Arizona |
Hunt Construction |
 |
|
Completion Date: 2009
CityScape is a high-rise mixed-use development in downtown Phoenix, Arizona, consisting of residential, retail, office, and hotel components. Buesing Corp. was hired to perform the excavation, shoring, and shotcrete finish wall. The job was chall... |
|
| Copper Crossing 20MW Solar Project (Phase II) |
Florence, Arizona |
Fluor Enterprises, Inc. |
 |
|
Completion Date: 2011
Fluor Enterprises, Inc. is the Engineering Procurement Contractor (EPC) on Phase II of the Copper Crossing Solar Plant in Pinal County, Arizona. Under contract with Fluor, Buesing Corp.’s scope of work on the project included the overall civil and si... |
|
| Copper Crossing 5MW Solar Project (Phase I) |
Florence, Arizona |
SunPower Corporation, Systems |
 |
|
Completion Date: 2011
The Copper Crossing Solar Plant project is located on 144 acres of former private agricultural land in Pinal County, Arizona. The project will have an overall capacity of 17MW and will be constructed in phases, with Phase I generating 5MW. Buesi... |
|
| Durango Regional Conveyance Channel |
Phoenix, Arizona |
Flood Control District of Maricopa County (FCDMC) |
 |
|
Completion Date: 2010
The Durango Regional Conveyance Channel (DRCC) is a large retention basin and channel that was completed in early 2010. The City of Phoenix will control the site and develop a multi-use recreational area for the surrounding community. Along wit... |
|
| Hospice of the Valley |
Phoenix, Arizona |
Arthur Porter Construction |
 |
|
Completion Date: 2010
The Hospice of the Valley on 16th Street in central Phoenix, Arizona, is the group’s newest not-for-profit, community-based health care services facility. The expansion of the building included a five-story below-grade parking structure over 45 fo... |
|
|
|
 |