Team Buesing was contracted during the design phase and worked with Killian Construction (GC) to deliver this site to the community in a fast track manner with design and construction running parallel. In addition to the site grading, site concrete, utilities, and paving work, Buesing provided the widening for turn lanes on the highway including box culvert extensions. An existing power line atop a hill near the highway presented a difficult challenge for the highway widening and necessary site distance.
Buesing was able to resolve this conflict by designing and installing a permanent soil nail retaining wall built from shotcrete colored to match the surrounding terrain. Since water was not available on the site, Buesing hauled water in trucks from a neighboring landowner and pumped the water from holding tanks up the hill to a pond that eventually was converted to provide temporary fire protection for the casino building until a permanent water source could be developed.
The Buesing Advantage was our multi discliplined expertise and our ability to overcome unforseen issues quickly and economically.