Project overview
The Phoenix Convention Center lies right in the heart of downtown. On this project, we were subcontracted by DNG Construction to install a permanent tie back retaining wall and excavate for a new underground Basement addition.

This required precision and the ability to work in very tight spaces with large heavy equipment. With the ROW (right of way) wedged between the Convention Center and the active Light Rail and most of the stretch of work only 50ft wide, Team Buesing was the best choice for the job.

The Buesing Advantage for this project was our vast experience with difficult downtown projects and our ability to self-perform all elements of our work.

Deliverables
174 Tension Anchors | 27,700 SF of Shoring Wall Excavated and Installed | 85 EA Soldier Beams (1.6M LBS) | 30,000 CY Mass Excavation and Export